본문 바로가기

Yeongjong Sky City Development Project
Behind Incheon International Airport, a hub airport in Northeast Asia, It is advocating a mixed-use approach (replantation + acceptance) for the first time in the country as a complex city development project comprising residential, industrial, business, and tourism functions
Business Outline
  • LocationUnbuk-dong, Unseo-dong, Unnam-dong, Jungsan-dong (Jung-gu)
  • Area19,300㎢ (5.84 million pyeong)
  • Project Period2003.08 - 2022.12.
  • Total project cost8.2121 trillion won
  • Estimated population133,629 (53,553 households)
  • Implemented byKorea Land and Housing Corporation (70%), Incheon Urban Corporation (30%)
  • Project detailsConstruction of a complex city with residential industry, business and tourism functions behind Incheon International Airport
Construction status by stage
영종하늘도시개발사업 단계별 준공현황 표 - Division, Phase 1, Phase 2-1, Phase 2-2, Phase 2-3, Phase 2-4, Phase 3, Total 제공 표
Division Phase 1 Phase 2-1 Phase 2-2 Phase 2-3 Phase 2-4 Phase 3 Total
Area(k㎡) 6,014 166 5,396 444 602 6,677 19,300
Date of completion ‘12.12 ‘14.12 ‘15.12 ‘16.12 ‘19.12 ‘22.12
Current completion status per phase(Phase 3)
  • Phase 3 Revitalization of the reserve area
    • Designing optimal land use plan (draft) through market and industry analysis
Yeongjong Aviation Cluster
Based on Incheon International Airport, a hub airport in Northeast Asia, and utilizing solid IT technology, it is evolving into an industrial base with a focus on aviation and space, including the aircraft MRO business and aviation training center. The aircraft engine maintenance center was created through a joint venture between UTC, a world-renowned engine maker, and Korean Air, while Boeing of the United States, the world's largest aircraft manufacturer, is building the largest flight training center in Asia.
  • Business Outline
    • Location : Unbuk-dong, Jung-gu, Incheon
    • Size : 494,849㎡
    • Project Period : 2008 - 2020
    • Business Areas : Aviation Operations Training Center, Aviation MRO Industry, Aerospace, Satellite and Defense Related Industries
Boeing Flight Training Center Termination
  • Location13, Yeongjongsunhwan-ro 900beon-gil, Jung-gu, Incheon, Republic of Korea
  • Size32,614.5㎡
  • Project Period2010 - 2016
  • Project detailsIntroduction of using simulators for pilot training and the operation of pilot training service
  • Total project cost150 billion won
  • Implemented byBoeing(USA), Korean Air
P&W Aviation Engine Maintenance Center Termination
  • Location15, Yeongjongsunhwan-ro 900beon-gil, Jung-gu, Incheon, Republic of Korea
  • Size69,208.5㎡
  • Project Period2010 - 2015
  • Project detailsAircraft engine assembly/disassembly/parts repair and performance testing, etc.
  • Total project costKRW 323.4 billion
  • Implemented byUTC Corporation (USA), Korean Air